Skip to content

Bridge to the future

Steel bridge linking UAS to new Auke Lake trail was installed Sept. 3rd

Bridge over Auke Lake outlet

A new 100 ft. steel bridge linking the Juneau campus and the Auke Lake parking area was installed Sept. 3rd.  It is part of a larger project to eventually link the Auke Lake campus and lake perimter trail.

 
 

Content maintained by Webmaster.